Tech Debt Explained for CEOs

Your engineers ask to put a few refactoring tasks into the next sprint. No new feature, no visible change for users, nothing to show the board. It looks like two weeks of salaries spent on making the code prettier. Does it bring the business anything?

Usually it does. The clearest way to see why is to think of tech debt as a loan.

Every time a team trades quality for speed, it borrows from itself. It ships today and promises to clean up later. Sometimes it borrows without choosing to: the product outgrows its design, or the team inherits legacy code from a previous team or agency. Like any loan, tech debt charges interest. Every feature built later in that area takes longer and breaks more often. And the interest compounds: left alone, the debt grows into indirect costs, like slower releases, missed deadlines and outages, and then into direct financial harm, like a lost client or a data incident.

So refactoring tasks are not cosmetic. They are loan repayments. The real question for a CEO isn't whether to pay, but which debt to pay, when, and how much of the team's time to give it. This guide answers that without asking you to read a line of code.

# Quick answer

  1. Tech debt is a loan. The principal is the work needed to fix a shortcut properly. The interest is the extra time and risk on every change built on top of it.
  2. Code quality tools won't show it. Ask engineers to list the debt that exists today, then to log new debt the moment they create it, on a separate board.
  3. Pay first where interest is high and the code changes often. Leave debt that nobody builds on. End-of-life software, security and compliance issues jump the queue.
  4. Give debt a fixed share of every sprint, and keep net debt at zero or below each quarter.
  5. Ask your CTO for a dashboard and the questions at the end of this article.

# 1. What tech debt is

# A loan with compound interest

The loan comparison isn't just a figure of speech. Each part of a loan has a direct match:

Loan Tech debt
Principal The work needed to fix the shortcut properly
Interest Extra time, bugs and risk on every change in that area
Compound interest Each feature built on the shortcut adds its own workarounds, so the next feature is even harder
Default That area breaks: an outage, a failed security audit, a feature you simply can't build
Repayment Refactoring: rebuilding that area properly, so new work there is cheap again

As with a business loan, borrowing isn't the problem. A loan with a known rate and a repayment plan can be a smart move. The problem is debt nobody wrote down, with interest nobody measures.

Time each new feature takes in that area Shortcut taken Interest extra time on every change compounds as features pile on top Repayment refactor the area (the principal) normal cost again dashed: cost without the shortcut features built over time →
An illustration: the interest grows with every feature built on the shortcut, until the area is repaid.

# Example: the notifications compromise

Here is how it typically happens. Picture a product whose notification system sends one email per event: order shipped, password reset, new comment. Each event goes out the moment it happens.

Then sales closes a big client who needs daily digests: all of a user's notifications in one email, once a day, in their time zone. That doesn't fit the current system, which only knows how to send one event at a time. Doing it properly means reworking the system to collect and group notifications, which is about four weeks of work. The client needs it in two.

So the team builds a compromise. Digests get their own side path: for this client's users, events go to a separate table instead of the main system, with their own sending code and their own templates. It doesn't match the rest of the notification code, but it goes live on time and the client is happy. So far, this is a reasonable loan.

Then the product keeps growing, and every new feature lands on top of the compromise:

Next feature Estimate Actually took What went wrong
Push notifications 5 days 9 days Events now live in two places, so push had to be connected to both paths, the main one and the digest one
Notification preferences 3 days 12 days Built twice. The digest path missed one case: users who turned off comment notifications still got them in digests
SMS notifications 5 days 20 days Two paths, two sets of preferences, two places to test. Fixing one path kept breaking the other

(These numbers are an illustration, not data from a real project.)

Estimate, days Actually took, days × estimate Push 5 9 1.8× Preferences 3 12 4× SMS 5 20 4×
The same shortcut, three features later: each one takes 2–4× its estimate.

By the third feature, a five-day task takes four weeks. And the preferences bug is no longer just a bug: users who switched notifications off keep getting them, so they mark your emails as spam. Once enough people do that, email providers start sending your other emails to spam too, password resets included.

That is the core of tech debt. It's a weak spot in one area of the product: a shortcut you can't safely build on. Everything built on top of it comes out worse, and each new layer makes it worse faster than the last, until something fails.

# Deliberate and accidental debt

Not all debt is a conscious trade-off like the digest shortcut.

  • Deliberate debt is a choice. You ship faster for a launch, a demo, a big client or an investor meeting. This is fine, as long as someone writes it down and plans when to pay it back.
  • Accidental debt is nobody's choice. The team didn't know a better way at the time. The requirements changed: a system designed for 100 clients now serves 10,000, or one built for one country now runs in five. You inherited legacy code from a previous team, an agency or an acquisition. Or the framework you built on simply got old and reached the end of its support.

Accidental debt is not a sign of a bad team. Every product that lives long enough builds it up. It needs the same treatment as deliberate debt: find it, measure it, decide.

# What isn't tech debt

Calling everything "tech debt" makes the term useless. These things aren't debt:

Not debt Why
Bugs A bug is a defect. Fix it as a bug. Debt causes bugs, but a bug on its own isn't debt
Missing features That's your roadmap, not your debt
"Code I'd write differently" A style preference that doesn't slow anyone down costs nothing
Old code that works and nobody builds on No one builds on it, so there's no interest to pay. An ugly admin report written five years ago that still works and never changes can stay as it is

A simple test: does this make future work in this area slower or riskier? If not, it's not debt worth tracking.

# 2. How to spot and track it

# Code quality tools won't show it

Linters and code-smell checkers look at code piece by piece: naming, length, duplicated lines, missing tests. They're useful, but they miss most real debt. The digest path from the example could be clean, well-formatted, fully tested code, and every tool would show green. The problem isn't in any single file. The problem is that two systems do the same job in different ways.

The only reliable source is the engineers who work in that area every day. From the outside, you can only notice the symptoms:

  • Estimates in one area of the product keep growing.
  • The same kind of bug keeps coming back.
  • You hear "we can't do that, it would break X" more and more often.
  • Only one person understands a certain part of the system, and everyone else avoids touching it.
  • Upgrades of the framework or libraries keep getting postponed.

These signs tell you debt exists. To manage it, you need a list.

# Start with a one-time audit

Ask each engineer to write down the debt they already know about: what it is, where it lives and how it gets in the way. Then hold one meeting to merge duplicates. A product a few years old will produce a long list. That's normal, and it doesn't mean all of it needs fixing. The list exists so you can choose what to pay.

# Log new debt the moment it's created

After the audit, the rule is simple: debt is logged the moment it's created. When an engineer takes a shortcut, they create the debt ticket right then, together with the feature, not later. A feature with a known shortcut isn't done until its debt ticket exists.

Keep these items on a separate Jira board, or in a separate epic, called "Tech debt", so they don't get lost among feature tickets.

Timing matters. Three months later, nobody remembers why the shortcut was taken, and the engineer who took it may have left the company. But logging on time is only half of it. A ticket that just says "refactor digests" is useless three months later too. Each ticket needs to describe the debt properly: what the shortcut is, why it was taken, what it costs and when it should be paid back. Use the same template for every ticket, like the one in A debt ticket template below.

Make logging safe. Logging debt is not a confession. If people get blamed for every item they add, they'll stop adding items, and the debt won't disappear. It will become invisible.

# Note the interest on each item

A list without priorities turns into a guilt list. To make it useful, each item gets a few fields:

  • Interest: how much it slows work in that area. Low, medium or high is enough, or a rough "about one extra week per feature".
  • How often the area is touched: every sprint, every month or rarely.
  • Principal: a rough estimate of the work to fix it properly.
  • Deadline: if there is one, such as a framework version that loses support on a known date.

The first two fields together tell you what the debt costs you. The digest path has high interest and gets touched every sprint, which makes it expensive. The old admin report has high interest but nobody touches it, so it costs nothing.

# Track added vs. removed

Once debt is logged, you can chart it. Each sprint has two numbers: debt added and debt removed.

The rule: net debt should be zero or below over each quarter.

Within the quarter, borrowing is allowed. A launch sprint can add debt, as long as each item has a payback date and the following sprints pay it down. This is the loan comparison at work: you borrow on purpose and repay on schedule.

Debt added Debt paid off Net debt since start of quarter +6 +3 -3 0 S1 S2 S3 S4 S5 S6 Launch sprint: +7 Quarter: −1
An illustration: a launch sprint borrows heavily, the next sprints pay it down, and the quarter ends below zero.

If net debt keeps growing quarter after quarter, you are taking new loans to pay the interest on old ones. That's the moment to raise the budget for debt, before the interest eats your roadmap.

# 3. How to pay it off

# What to pay first

Sort the board in this order. You don't need a new field for it: Jira's built-in Priority field is enough, with one level for each group below.

  1. ASAP: hard deadlines. A framework or language version reaching end of life, a known security vulnerability, a compliance requirement. Pay these regardless of interest, because the default happens on a fixed date.
  2. High: high interest, often-changed code. Pay now. Every sprint you wait costs you more. The digest path belongs here.
  3. Medium: high interest, rarely changed code. Schedule it before the next time you need to work in that area, for example as the first step of the next big feature there.
  4. Low: low interest, or code nobody touches. Leave it, and review it once a quarter. The old admin report belongs here.
ASAP Hard deadline: end of life, security, compliance whatever the grid says Never touched Rarely changed Often changed High interest Low interest Low Leave it old admin report Medium Before the next work in that area High Pay now digest path Low Leave it, review once a quarter how often the area is changed →
The four priority levels: deadlines first, then interest × how often the area changes.

This order keeps the team from spending months polishing code that nobody uses while the part everyone builds on keeps getting worse.

# A fixed share of every sprint

Agree with your CTO on a fixed share of each sprint for debt. 15–20% of the team's capacity is a common starting point.

The share should be fixed because, when debt competes with features sprint by sprint, debt always loses. A feature has a client and a deadline. Debt has neither, until it causes an outage. A fixed share removes the negotiation.

Debt items go into the sprint as regular tasks, with a clear done state. Large items get split into steps that fit the share. In the example, merging the digest path into the main notification system is now about six weeks of work. It was four before push, preferences and SMS were built on top of the shortcut: the principal grows too, not just the interest. At 20% of the team's time, it becomes a series of steps, each delivering something:

  1. Move digest events into the main notification queue.
  2. Make preferences work from one place for both emails and digests.
  3. Switch digest sending to the main system.
  4. Delete the old digest table and code.

After step 2, the preferences bug is fixed. After step 4, the next notification feature costs what it should.

Review the share every quarter. If net debt grows, raise it. If the board is short and estimates are stable, lower it and give the time back to features.

# Ask your CTO for a dashboard

You shouldn't need to open Jira to know where your debt stands. Ask your CTO for a dashboard that you can read in two minutes once a month. You can send this list as it is:

Tech debt dashboard: what it should show

1. Open debt: number of items and total estimated days to fix
2. Debt added vs. removed per sprint, and net for the quarter
3. Share of sprint capacity spent on debt: planned vs. actual
4. Items with a hard deadline (end of life, security, compliance) and their dates
5. Top 5 open items by priority (ASAP, High, Medium, Low)

# A debt ticket template

Every debt item should answer the same questions. Here is the digest shortcut as a ticket:

Title:          Merge digest notifications into the main notification system
Area:           Notifications
Type:           Deliberate: digest launch for a key client, March
Why it exists:  Digests were needed in 2 weeks; the proper rework needed 4
What it costs:  Every notification feature is built twice;
                preferences bug in digests (users who turned notifications
                off still get them)
Interest:       High: each notification feature takes 2–4× its estimate
Touched:        Every sprint
Priority:       High
Principal:      About 6 weeks (was 4 before push, preferences and SMS)
Deadline:       Before the next notification feature on the roadmap
Payback plan:   4 steps of about 1.5 weeks, within the 20% debt share
Done when:      Digests use the main queue; old digest table and code deleted
Owner:          Backend team lead

# 4. Questions to ask your CTO

You don't need to understand the code to manage debt well. You need to ask the right questions, and know what a good answer sounds like.

Question A good answer A warning sign
What are our three most expensive debts right now? Specific areas, with how much each slows the team down "The whole codebase is a mess"
How much of each sprint goes to debt? A fixed share, and what it was spent on last sprint "Whenever we have time"
Is net debt going down this quarter? Yes or no, with the chart "It's hard to measure"
What did we borrow in the last release, and when do we pay it back? A short list with payback dates "Nothing", when the release was rushed
Which of our software reaches end of support in the next 12 months? A list with dates and a plan for each Surprise when the date arrives
Which parts of the system does only one person understand? Names, and a plan to share that knowledge "None", when you already know one
What debt stands in the way of our next big feature? Specific items, with what they add to the estimate "We'll see once we start"

# Common traps

  • The rewrite fantasy. "Let's rebuild everything from scratch" sounds like paying off all the debt at once. In practice, a rewrite takes far longer than planned, the old system needs maintaining in parallel, and the new one starts building its own debt. Pay off the worst areas one at a time.
  • Aiming for zero debt. Zero debt means never borrowing, which means never shipping fast when it matters. The goal is debt you chose and can afford, not no debt at all.
  • Refactoring with no goal. "Clean up the notifications module" can go on forever. Every debt item needs a done state you can check: "digests use the main queue, the old table is deleted."
  • Hiding debt work inside feature estimates. Padding every estimate to "fix things along the way" feels convenient. But then nobody sees the debt, nobody can manage the budget, and padding is the first thing cut when a deadline gets tight.
  • Blaming the previous team. Inherited debt is a fact, not an excuse, and not a reason for a rewrite. The useful question is what it costs now and what to pay first.
  • Letting AI-written code pile up debt. AI tools help teams write more code, faster. That also means borrowing faster: code that works but doesn't fit the rest of the system, or logic duplicated in several places. The same rules apply: review it, log the shortcuts, watch net debt. Faster output with a growing debt board is not a productivity gain.

# Summary

Tech debt is not an engineering hobby. It's a loan the company takes when it trades quality for speed, or when the product outgrows its own code. Some of these loans are worth taking. All of them charge interest.

Log every debt when it appears, note its interest, pay first where interest is high and the code changes often, give debt a fixed share of every sprint, and keep net debt at zero or below each quarter.

Do that, and the refactoring tasks in your sprint stop looking like lost time, and start looking like what they are: repayments on a loan you chose to take.

Denys Koronets
// about the author

Senior PHP / Node.js developer with 12+ years of building and scaling web products with Laravel, Symfony, Node.js and modern frontends. I work with clients in Europe and North America, on my own or with a team I put together.

// looking for a team

Need a team?

I can put together a remote PHP/JS team for you, from a single senior developer to a full team with a tech lead.

  • Selected for your project: Middle and Senior Laravel developers, plus Vue/React, QA and DevOps if you need them
  • Daily reports or hour logs, whichever you prefer
  • Sprints in Jira with transparent velocity
  • 3–4 hours of overlap with your time zone, in Europe or North America
  • Days off planned in advance, with a backup for every developer
  • 35–65% lower cost than hiring in Western Europe or North America, on a simple B2B contract
// hire me

Need a developer / Team Lead / CTO?

Hire me directly: I join your existing project or build a new one from scratch.

  • Laravel, Symfony, Node.js, Vue / Angular, AWS
  • Architecture, code reviews and releases, or a tech lead for your team
  • B2B contract, usually signed within a week